I SWEAR I am trying to find the time, the energy, the resources, and the HELP to set up these lasers, and it all has to come together at once. It is no good to have the time of you cannot pay the help. It is no good to have the help if you cannot set aside the time to work with them. Each laser would need to be opened and set up on a table or something, to determine how much space it needs. Then a workbench would be built for THAT laser. Rinse and repeat. The smaller lasers, like the F1 Ultras with the conveyor belts are fairly easy to figure out. However, the P2, and the S1's, and the M1 Ultras ... they all have conveyor systems that stick out of both sides and I have no clue how much space will be needed for each one.
I don't want a rat's next of extension cords, so as I set up each machine, I will run a dedicated 120VAC outlet to it. I also need to hang the smoke removal ducting from the ceiling, but that cannot be done until all of the machines are in place.
I want the 3D printers UPSTAIRS with the lasers, but they are too big to take up the stairway, so I have to wait until the elevator is fully functional. Otherwise I will need to cut a large doorway into the wall, and fabricate a sliding or swinging door pair to the opening. MORE construction and time. UGH! This may be my best option though, because my forklift can reach the second floor.
Sometimes I am so energetic, while other times, I wouldn't bother to pee on my home if it were on fire.
Joe